Testing & acceptance
Electrical measurements, pressure tests and technical checks before handover.
HSE and QA/QC run in parallel with execution. Quality and safety records are part of the scope of work, not paperwork produced after acceptance.
HSE and QA/QC run in parallel with execution. Quality and safety records are part of the scope of work, not paperwork produced after acceptance.
Electrical measurements, pressure tests and technical checks before handover.
Technical operations with PPE and signed records.
Site acceptance with as-built documentation.