Mechanical

LAB & QC equipment relocation — Systeel Vietnam

Relocation of laboratory and QC equipment with related utilities for Systeel Vietnam JSC

Information

Client
Systeel Vietnam Joint Stock Company
Location
Systeel Vietnam plant
Year
2026
Scope
Relocate LAB/QC machines, utility disconnect/reconnect and finishing works
Field
Mechanical

Overview

BTH delivered LAB and QC equipment relocation for Systeel Vietnam JSC, including dismantling, internal transport, re-installation and utility finishing for post-move operation.

The goal was a safe move to the new location with limited equipment damage and reduced disruption to LAB/QC activities.

Scope

  • As-found survey and dismantle/install sequence
  • Dismantle LAB/QC equipment, protect and move on site
  • Re-install and align at the new location
  • Complete related piping, utilities and ancillary works

Execution

Works were staged: isolate utilities → dismantle → transfer → re-install → reconnect → check. External items (pipes, façade vents) were finished in parallel when access allowed.

HSE & quality

Lift control, protection of sensitive instruments and segregated work areas. After install, mechanical connections, utilities and housekeeping were reviewed before handover.